SUPERSTRUCTURE PROJECTS

TANDOGAN INTERSECTION ANKARA

Despite all the infrastructural challenges, this intersection project in the Tandoğan area was successfully completed thanks to the effective use of investor manufacturing solutions.

ANKARA SIHHIYE FIRST MULTI-STOREY PARKING GARAGE

Sıhhiye Multi-storey Car Park, the first public structure of Aktürk, has a construction area of 40.000 m2. With a capacity of 1200 vehicles and 71 shops, this project, which provides a solution to the parking problem of Kızılay, was completed in a very short time and put into service of the people of Ankara.

INTERSECTION OF TBMM AND CHIEF OF STAFF

The construction of the crossing and intersection in front of the Turkish Grand National Assembly and the General Staff Headquarters was completed in a very short time despite all the difficulties and was put into the service of the people of Ankara and received great appreciation.

AŞTİ ÇAY ROAD SUBWAY CONSTRUCTION

ASTI-Çayyolu Metro and 2nd Stage construction of Ankara rail public transportation systems has a total line length of 12.500 m and is constructed with tonnel and go copa system. It is a state-of-the-art combined metro system with 10 underground stations, various tonnels and underground transfers.

METRO LINE PROJECT BETWEEN KIZILAY AND ÇAYYOLU STATIONS

Started in 2002, Metro 1 project has a length of 9388 meters. It was completed in 2007 and delivered to the administration. There are 7 stations in the project. Approximately 1945 meters of the line consists of a bored tunnel and 5953 meters of the line consists of a cut-and-cover structure.

ANKARA ESKISEHIR HIGHWAY ROAD RECONSTRUCTION AND ÇAĞLAYAN INTERCHANGE

The construction of the Eskisehir Road 8+203 km - 11+770 km road widening and the Çağlayan Interchange on the current direction, the tender for which was awarded in 2006, was completed by Aktürk Construction in 2008. In addition to the road and interchange works, infrastructure transfers and displacements were also included in the work.