AŞTİ-ÇAYYOLU METRO CONSTRUCTION

The ASTİ-Çayyolu Metro and Phase 2 construction of Ankara’s rail public transportation systems has a total track length of 12,500 meters and was built using tunnel and cut-and-cover methods. The line features 10 underground stations, various tunnels, and a state-of-the-art combined metro system for underground transfers.

KIZILAY-ÇAYYOLU METRO LINE PROJECT

The Kızılay-Çayyolu Metro and Phase 2 construction, part of Ankara's rail public transportation systems, also has a total track length of 12,500 meters and was constructed using tunnel and cut-and-cover methods. It includes 10 underground stations, various tunnels, and a cutting-edge combined metro system for underground transfers.

Key project dimensions include:
● Station Area: 61,690 m²
● Concrete: 440,000 m³
● Excavation: 2,080,000 m³
● Steel: 103,000 tons

ADAPAZARI KARAKÖY PERMANENT HOUSING, TECHNICAL INFRASTRUCTURE WORKS PHASE 1 AND 2

BOLU PERMANENT HOUSING TECHNICAL INFRASTRUCTURE PROJECT

TURKEY INFRASTRUCTURE AND URBAN REDEVELOPMENT PROJECT

The road constructions, sewer lines, stormwater lines, drinking water lines, electrical distribution lines, telecommunications infrastructure, and substation buildings of the SBG-1 package of the Turkey Infrastructure and Urban Redevelopment Project were successfully completed by Aktürk İnşaat in 2003.

AKPINAR SPECIAL INDUSTRIAL ZONE GENERAL INFRASTRUCTURE CONSTRUCTION

The general infrastructure construction of the Akpınar Special Industrial Zone in Yassıören Village, Çatalca District of Istanbul, which spans 1,200,000 m², was undertaken by Aktürk Yapı. The project was completed in May 2008 and included technical infrastructure works such as drinking water, stormwater, wastewater infrastructure, telecommunications infrastructure, stream rehabilitation, culverts, and concrete and asphalt roads, executed by İRE İnşaat, a subsidiary of Aktürk Yapı.

en_USEnglish